- Study Process
- Recommendations
- Why a new Middle School?
- Next Steps
- Proposed Project Timeline
|
|
3
|
- Schools Studies
- Esten Elementary School
- Jefferson Elementary School
- Memorial Park Elementary School
- Rogers Middle School
- Rockland High School
- Design Team Investigated Existing Conditions
- Site
- Building
- Structure
- Plumbing, Fire protection, HVAC, Electrical
- Technology
- Hazardous Materials
- MSBA Rating (1-4)
|
|
4
|
- Educational Programs Developed
- Administrators and Focus Group Meetings
- N.E.S.D.E.C. Enrollment Projections
- Grade Reorganization
- Educational Specifications
- Design Options Study
- Multiple Options
- The Cost to Maintain the Facilities
- Additions/Renovations
- New Construction
|
|
5
|
- Build New Middle School behind existing building and raze old school
building
- Grade configuration
- Grades 5 thru 8, or
- Grades 6 thru 8 with a kindergarten center
- Estimated cost in 2006 dollars
- $37.5 million
- 32 – 36 months construction
- Target date - occupy fall 2011
|
|
6
|
- Building a New 5-8 Middle School Rockland Achieves:
- An 800 student capacity building
- A School building designed to be a middle school
- Available classroom space in the elementary school
- Important community resource
|
|
7
|
- Rogers Middle School Has Greatest Needs
- Built 1928, Last Renovated 1976
- Multiple Building Systems Needs
- 4 ½ stories of Educational Space
- Inhibits Modern Day Middle School Education
- Current Educational Capacity of 375 students
- Today’s Enrollment 630 students
- MSBA rating of 3 out of 4; (4 being the worst)
|
|
8
|
- Rogers Middle School Existing Capacity – 24 classrooms available
- 15 classrooms @ 25 Students/CR=375 Students
- 22 of 24 classrooms are smaller than 750 sqft.
- There are no science rooms in excess of 720 sqft..
|
|
9
|
- Educational Specifications
- Rogers Middle School
- 800 Grade 5 – 8 Students
- (8) Teams = (2) 100 student teams/grade
- 28 Math, English, Social Studies, Language Classrooms
- 8 Science Classrooms with 4
prep rooms
- 36 Total Classrooms
- And…
|
|
10
|
- Language Lab
- Art, Band and Chorus
- Family and Consumer Science
- Computer Labs(4)
- Library/Media Center
- Gymnasium and Fitness Room
- 500 Seat Auditorium
- Special Education
- Administration
- Teacher and Support
- Community Access Areas
|
|
11
|
- New Middle School $37,426,475
32 Months
- Additions/ Renovations to Existing Middle School $37,486,555 36 Months
- Convert High School to A Middle School $52,476,780 48 Months
- Add the cost of a new high school $42,875,000 32 Months
- Combine the High School and Middle School $74,342,655
- *The Projected Cost of Maintaining the Middle School $13,121,767
- Note: This cost has historically Not been reimbursable.
- Project Costs are 2006 Dollars
|
|
12
|
- New High School
- 150,000 sf
- $43 Million
- 32-36 months to construct
- Minimal School Disruption
|
|
13
|
|
|
14
|
|
|
15
|
|
|
16
|
|
|
17
|
|
|
18
|
- Preliminary Schematic Design
- Investigations
- Site Survey
- Geotechnical Analysis
- Ground Water Study
- Environmental Study
- Traffic Study
- Meet with abutters/neighborhood
- Grant research and application writing
- Develop The Educational Program
- Develop The Design
- Develop The Project Costs
- Meet Regularly With The Building Committee
- Meet With Town Boards, Departments and Officials
- Conduct Community Forums
- Discuss Project With MSBA
- Report to Spring 2007 Town Meeting
|
|
19
|
- Spring 2006 - Feasibility Study
- May 2006 - Town Meeting Report
- *Secure Preliminary Design Funds
- Summer 2006 - Preliminary Schematic Design
- Spring 2007 - Town Meeting Report
- *Secure Design Funds
- July 2007 - MSBA Submission
- Summer 2007 - Develop The Design
- Spring 2008 - Town Meeting Report
- *Secure Construction Funds
- Summer 2008 - Commence Construction
- Spring 2011 - Complete Construction
- Summer 2011 - Demolish Existing Rogers Middle School
- Fall 2011 - Occupy New Middle School
|